On this project, Soko Engineering was responsible for the design and execution of the complete CO₂ refrigeration system, including mechanical and electrical installations, a BMS system for monitoring and control, as well as the supply and installation of cold storage panels and doors. The implemented solution ensures reliable, energy‑efficient, and environmentally friendly operation of the facility, in line with modern sustainability and food safety standards.

The distribution center covers approximately 2,500 m² of cooled space, including the dispatch area, with an operating temperature regime of 8 to 12°C, thereby providing optimal conditions for storing and preserving fresh fruits and vegetables throughout the entire logistics process.

As with all its projects, Soko Engineering applied proven technological solutions and equipment from renowned manufacturers, guaranteeing a high level of reliability, system durability, and maximum energy efficiency.

We are especially proud of the fact that this project also marks the 125th CO₂ refrigeration installation that Soko Engineering has designed, installed, and continues to maintain.